Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Table 2-1. Unit Preventive Maintenance Checks and Services (PMCS) - cont
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2330-398-24 Table 2-1.  Unit Preventive Maintenance Checks and Services (PMCS) FOR THE M969A2 (continued) Item Item to Not Fully Mission No. Interval Check/ Service Procedure Capable If: 6 Semiannual Bogie a. Position semitrailer on hard level surface Assembly with front resting on landing gear. Jack and block frame. Remove tire and wheel assemblies (para 2-62). NOTE Clean  axle  and  suspension  system with  water  and  fiber  brush  to  allow for careful inspection. b. Inspect general condition of trunnion tube, axles, and leaf springs. Look for cracks or damage. If cracked or damaged, notify Direct Support maintenance CLIP LEAF SPRING c. Check tightness of U-bolts and clips on leaf springs. Tighten loose U-bolts and clips.  If damage or wear is evident, notify Direct Support maintenance. d. Check tightness of U-bolts and screws on leaf spring cap and seat. Tighten loose U-bolts and screws. If damage or wear is evident, notify Direct Support maintenance. 2-8 U-BOLT LEAF SPRING CAP (HIDDEN) TRUNNION TUBE AXLE (HIDDEN)

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business