| |
TM 9-2330-398-24
3-16. ENGINE AND PUMP CABINET FRAME REPLACEMENT (continued).
6.
Install two new seals (13 and 15) and split couplings (11 and 17) on inlet and outlet lines (10 and 14) with four nuts
(12 and 16).
7.
Install conduit mounting plate (19) and two screws (18) and new self-locking nuts (21) on engine and cabinet
frame (20).
8.
Install electrical lead (6) on alternator (7).
9.
Install two electrical leads (9 and 10) on engine electrical box (8).
10.
Install 1/4-inch oil pressure tube (1) on oil adapter (4) and tee (2) on primary fuel filter (3).
FOLLOW-ON MAINTENANCE:
Disconnect ground (refer to TM 9-2330-398-10).
Connect engine throttle cable (para 3-23).
Install batteries (para 2-32).
Install curb-side hose trough access cover (para 2-76).
Install muffler shroud (para 2-99).
Install muffler and exhaust pipe (para 2-99).
3-52
|