| |
TM 9-2350-398-24
2-143. PREPARATION OF EQUIPMENT FOR SHIPMENT (continued)
d. Thread both ends of hold-down rod (1 1/4 in. diameter, as long as required). Insert one end of hold-down rod through
lifting eye on front of vehicle. Bend rod and insert other end through stake pocket on opposite side of flatcar. Repeat
operation with second rod and lifting eye on front of vehicle, and with two rods on rear of vehicle.
Transportation
When transporting the semitrailers by any means other than railroad flatcar, transport in accordance with MTMCTEA PAM
55-19 of the Military Traffic Management Command (MTMC) Transportation Engineering Agency (TEA).
2-304
|