| |
TM 9-2350-398-24
2-133. CONTROL CABLES REPLACEMENT.
This Task Covers:
a.
Removal
b. Installation
c.
Adjustment
Initial Setup:
Tool Test Equipment: Equipment Conditions:
General mechanic's tool kit (Item 4,
Semitrailer uncoupled (refer to TM 9-2330-398-10).
Appendix B)
Semitrailer bonded and grounded (refer to
TM 9-2330-398-10).
Material/Parts:
Cotter pin (item 8, Appendix F)
Personnel Required:
Two
a.
REMOVAL
1. Loosen two nuts (7) and U-bolt (8) on lever of emergency valve A (5).
2. Pull control cable (6) free of lever of emergency valve A (5).
3. Remove cotter pin (17) and straight pin (18) and connecting link (16) from emergency valve A control handle (15).
Discard cotter pin.
4. Pull control cable (6) free of bracket (11), and remove control cable (6) from Semitrailer.
5. Remove three nuts (12, 14, and 22), connecting link (16), and stud (13) from control cable (6).
6. Loosen two nuts (4) on U-bolt (3) on shut-off lever handle (1).
7. Pull control cable (2) free of post (9).
8. Loosen two nuts (20) on U-bolt (19) on trip bracket (21) and remove control cable (2) from trip bracket (20).
b.
INSTALLATION
1. Install control cable (2) on trip bracket (21) with U-bolt (19) and two nuts (20).
2. Route control cable (2) through post (9) to shut-off lever handle (1).
3. Install control cable (2) on shut-off lever handle (1) with U-bolt (3) and two nuts (4).
4. Install control cable (6) through bracket (11).
5. Install stud (13), connecting link (16), and three nuts (12, 14, and 22) on control cable (6).
6. Install connecting link (16) on emergency valve A control handle (15) with straight pin (17) and new cotter pin (18).
2-290
|