Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: REMOVAL OF GROUND RECEPTACLE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2330-398-24 2-113.  VAPOR RECOVERY SYSTEM REPLACEMENT  (continued). e. REMOVAL OF GROUND RECEPTACLE 1 Remove screw (46) self-locking nut (43), and ground lead (48) of ground receptacle (42) from bracket (44).  Discard self-locking nut. 2. Remove  two  screws  (47)  and  self-locking  nuts  (45)  and  receptacle  (42)  from  bracket  (44).    Discard  self-locking nuts. 3. Remove screw (46), self-locking nut (43), and bracket (44) from semitrailer.  Discard self-loc king nut. f. INSTALLATION OF GROUND RECEPTACLE 1. Install bracket (44) on semitrailer with screw (46) and new self-locking nut (43). 2. Install receptacle (42) on bracket (44) with two screws (47) and new self-locking nuts (45). 3. Install ground lead of ground receptacle (42) on bracket (44) with screw (46) and new self-locking nut (43). FOLLOW-ON MAINTENANCE: Disconnect ground (refer to TM 9-2330-398-10). 2-250

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business