| |
TM 9-2330-398-24
2-113. VAPOR RECOVERY SYSTEM REPLACEMENT (continued).
e.
REMOVAL OF GROUND RECEPTACLE
1
Remove screw (46)
self-locking nut (43), and ground lead (48) of ground receptacle (42) from bracket
(44). Discard self-locking nut.
2.
Remove two screws (47) and self-locking nuts (45) and receptacle (42) from bracket (44). Discard self-locking
nuts.
3.
Remove screw (46), self-locking nut (43), and bracket (44) from semitrailer. Discard self-loc king nut.
f.
INSTALLATION OF GROUND RECEPTACLE
1.
Install bracket (44) on semitrailer with screw (46) and new self-locking nut (43).
2.
Install receptacle (42) on bracket (44) with two screws (47) and new self-locking nuts (45).
3.
Install ground lead of ground receptacle (42) on bracket (44) with screw (46) and new self-locking nut (43).
FOLLOW-ON MAINTENANCE:
Disconnect ground (refer to TM 9-2330-398-10).
2-250
|