| |
TM 9-2330-398-24
2-111. ENGINE STARTER AND SOLENOID REPLACEMENT.
This Task Covers:
a. Removal
b. Disassembly
c. Cleaning and Inspection
d. Assembly
e. Installation
Initial Setup:
Tool Test Equipment:
Equipment Conditions:
General mechanic's tool kit (Item 4,
Semitrailer uncoupled from prime mover (refer to
Appendix B)
TM 9-2330-398-10).
Semitrailer bonded and grounded (refer to
Materials/Parts:
TM 9-2330-398-10).
Drycleaning solvent (Item12, Appendix C)
Negative battery cable disconnected (para 2-33).
Rag (Item 25, Appendix C)
Lockwasher (2) (Item 114, Appendix F)
Lockwasher (5) (Item 118, Appendix F)
a. REMOVAL
WARNING
When performing electrical maintenance, ALWAYS disconnect intervehicular
electrical cable from semmitrailer and disconnect negative battery cables at
batteries. Failure to follow this warning may create a spark and explosion,
resulting in serious injury or death to personnel.
NOTE
The engine starter removal procedure is done from underneath the vehicle, on left
side of engine.
1. Remove two screws (1 and 3), lockwasher (4), and shroud (2) from engine (5). Discard lockwasher.
2. Remove nut (16), lockwasher (15), and lead (14) from pole of solenoid (17).
3. Remove nut (11), loclkwasher (12), and lead (13) from pole on rear side of solenoid (17). Discard lockwasher.
4. Remove two screws (6 and 9) and lockwashers (7 and 8), baffle (18), and engine starter (10) from engine (5).
Discard lockwashers.
b.
DISASSEMBLY
1. Remove nut (20), lockwasher (21) and lead (19) from solenoid (17). Discard lockwasher.
2. Remove two screws (24), washer (22), and solenoid (17) from front housing (23) of engine starter (10).
2-232
|