Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: SAFETY RELIEF VALVE REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2330-398-24 2-55.  SAFETY RELIEF VALVE REPLACEMENT. This Task Covers: a.  Removal b.  Installation c.  Test Initial Setup: Tools/Test Equipment: Equipment Conditions: • Common no.  2 tool set (Item 2, Appendix B) • Semitrailer uncoupled (refer to TM 9-2330-356-10). • General mechanic's tool kit (Item 4, Appendix B) • Semitrailer bonded and grounded (refer to TM 9-2330-398-1 0). Materials/Parts: • Antiseize tape (Item 30, Appendix C) a.  REMOVAL 1.    Remove air line (1) and adapter (2) from end of safety relief valve (3). 2.    Remove valve (3) from nipple (7). 3.    Remove nipple (7) from elbow (6). 4.    Remove elbow (6) and bushing (5) from primary (rear) air reservoir (4). b.  INSTALLATION 1.    Install elbow (6) and bushing (5) on air reservoir (4). 2.    Apply Teflon Antiseize tape to threads  of  nipple (7), and install nipple (7) in elbow (6).  Install side port of valve (3) on nipple (7). 3.    Install air line (1) and adapter (2) on valve (3). c.  TEST 1.    Attach end of air system test gage, without valve, to semitrailer emergency gladhand. 2-138

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business