| |
S e c t i o n V I I l . F I R E
TM 9-2330-272-14
E X T I N G U I S H E R S Y S T E M M A I N T E N A N C E
c.
5-12. FIXED FIRE EXTINGUISHER MAINTENANCE.
This Task Covers:
a.
Control Valve and Pull Box Removal
f.
Nozzles Installation
b. Cylinder Removal
g.
Lines and Fittings Installation
Lines and Fittings Removal
h.
Cylinder Installation
d.
Nozzles Removal
i.
Control Valve and Pull Box Installation
e.
Cleaning and Inspection
Initial Setup:
Equipment Conditions:
Materials/Parts:
l Tank purged (para 4-64).
l Dry cleaning solvent (Item 16, Appendix E)
Tools/Test Equipment
l Antiseizing tape (Item 18, Appendix E)
l General mechanics tool kit
l Eight lockwashers
5-29
|