TM 9-2330-272-14
4-28. INTERVEHICULAR CABLE RECEPTACLE MAINTENANCE.
This Task Covers:
a.
Removal
c.
Installation
b.
Repair
Initial Setup:
Equipment Condltlons:
Materials/Parts:
l Intervehicular cable disconnected from semitrailer
(para 2-12).
l Marker tags (item 17, Appendix E)
l One gasket
Tools/Test Equipment:
l Four locknuts
l General mechanics tool kit
a. REMOVAL
1.
Remove six screws (1) and nosebox cover (2) from nosebox (3).
2.
Tag wires for installation if identification bands are missing or not legible (para 4-20).
3.
Disconnect seven plug connectors (7).
4.
Remove two locknuts (5), ground leads (6), and screws (10) from receptacle (9). Discard locknuts.
5.
Remove two locknuts (4), screws (11), receptacle (9), and gasket (8) from nosebox (3). Discard locknuts and
gasket.
For repair of receptacle refer to paragraph 4-27.
c.
INSTALLATION
1.
Install new gasket (8) and receptacle (9) on nosebox (3) with two screws (11) and new locknuts (4).
2.
Install two screws (10), ground leads (6), and new locknuts (5) on receptacle (9).
3.
Connect seven plug connectors (7).
4.
Install nosebox cover (2) on nosebox (3) with six screws (1).
4-42
|