Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section II. OPERATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM  55-4920-383-13&P Section  II.  OPERATION 2-3. Turn-On   Procedure. To  turn  the  Test  Set  on  proceed  as  follows: a. Position  Test  Set  ON/OFF  switch  (20,  figure  2-1)  to  OFF. b. Connect  one  end  of  Test  Set  power  cable  (see  table  1-2)  W1  to  Test  Set  input  power connector  J1  (16).    Connect  the  other  end  of  W  1  to  either  power  adapter  W2  or  W3.  Connect the  free  end  of  W2  or  W3  to  115  VAC  400  Hz  source.    This  connection  requires  no  attention to  polarization,  since  neither  side  of  the  power  circuit  is  grounded  in  the  Test  Set. WARNING The  Test  Set  must  be  grounded  prior  to  connection  to  aircraft  fuel  gage  system under  test. c. Connect  the  Test  Set  GND  terminal  (15)  to  a  source  of  ground  potential  using  test lead  W10.  Suitability  of  grounding  connection  depends  upon  where  the  Test  Set  is  being used.  If  the  Test  Set  is  in  use  at  a  bench  in  the  laboratory  or  field  shop,  make  connection to  the  bench  ground  strap.    If  the  Test  Set  is  being  used  in  an  aircraft,  attach  the  ground connection  to  any  convenient  point  on  the  aircraft’s  ground  bus  or  structure  that  is  free  of paint  or  other  insulating  material. d. Connect  Test  Set  accessory  cables,  as  required,  to  unit  or  system  to  be  tested. (See  table  1-2  and  para.  2-6.) e. Position  Test  Set  ON/OFF  switch  (20)  to  ON.  No  warm  up  time  is  required before  performing  specific 2-4. Turn-off   Procedure. tests. To  turn  off  Test  Set  proceed  as  follows: a. Position  Test  Set  ON/OFF  switch  (20,  figure  2-1)  to  OFF. 2-10

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business