| |
TM 55-2915-335-30&P
2-25. FUEL BOOST PUMP /CARTRIDGE - FINAL TEST (Cont)
2-25
1. INSPECTION - ASSEMBLED CARTRIDGE AND
HOUSING
a.
b.
c.
d.
e.
Check that matchmarks on pump cartridge (1)
and pump housing (2) are in line.
Check that cartridge retaining ring (3) is installed
in housing. If retaining ring is not installed, refer
to paragraph 2-10.
Check that umbrella check valve (4) is installed on
canister (5). Check that umbrella check valve (6) is
installed in adapter plug (7). If umbrella check
valve (4) is not in place, refer to paragraph 2-11. If
umbrella check valve (6) is not installed, refer to
paragraph 2-12.
Check that pump canister (5) is secured tight to
pump housing (2) and that all attaching hardware
is secure.
Make sure there are no dents or nicks in the
canister. If canister is dented, refer to paragraph
2-11.
GO TO NEXT PAGE
2-94
|