|
|
TM 5-5430-226-12
4-19. 4-INCH GATE VALVE MAINTENANCE - cont.
This task covers:
a. Removal
d. Inspection
g. Installation
b. Disassembly
e. Repair
c. Cleaning
f. Assembly
INITIAL SET-UP:
Tools required:
Tool Kit, General Mechanics, Automotive (Appendix B, Sec. III, item 1)
Torque Wrench (0-50 Inch-pounds) (Appendix B, Sec. III, item 2)
Mallet (Appendix B, Sec. III, item 2)
Materials/Parts required:
Detergent, General Purpose (Item 1, Appendix D)
Rag, Wiping (Item 2, Appendix D)
Flange Gasket (2) - X-3702C
Packing Ring (3) - 235RF-05082P
Body Gasket - 235RF-05092G
Coupling Gasket - MS27030
Equipment Condition:
Water tank empty.
a. Removal. Disconnect gate valve from water tank filler/discharge assembly.
b. Disassembly.
NOTE
Disassemble valve only to extent required to accomplish repair.
(1) Disconnect dust cap (20). Remove eight nuts (25), lockwashers (24), washers (19), bolts (18), and dust
cap (20). Separate flanged coupling (17) and gasket (16) from valve body (15).
(2) Remove gasket (21) from dust cap (20).
(3) Disconnect dust plug (26). Remove eight nuts (23), lockwashers (22), washers (27), bolts (28), and dust
plug (26). Separate flanged coupling (30) and gasket (31) from valve body (15).
(4) Remove gasket (29) from flanged coupling (30).
(5) Remove nut (1) and handwheel (2) from stem (10).
4-22
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |