Click here to make tpub.com your Home Page

Page Title: Packing
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5430-226-12
2-10. PREPARATION FOR MOVEMENT - cont.
b. Folding - cont.
NOTE
Four personnel are required to fold a 20K tank and five personnel are required to fold a 50K tank.
Push out trapped air through the vent while folding and rolling tank.
(1) Remove dust cap (8 or 8.1) from water tank vent fitting (7) or vent pipe (7.1).
(2) Working from sides of water tank (13) (sides with longest length), tightly fold both sides in toward center of
tank as shown. Brush off any stones, dirt, twigs or debris that stick to tank fabric.
(3) Roll tank toward vent fitting (7) or vent pipe (7.1). Install dust cap (8) and close locking arms or install
threaded dust cap (8.1) and tighten fully.
(4) Tie tank bundle.
(5) Remove water tank (13) from ground cloth (14).
(6) Fold ground cloth (14) into bundle. Remove any stones, dirt, twigs or debris that stick to ground cloth.
(7) Tie ground cloth (14) bundle.
c. Packing. If water tank is supplied as part of the 40K water distribution system, refer to TM 5-4610-234-13 for
instructions on packing water tank in re-useable container.
2-16

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business