|
|
TM 5-5430-226-12
2-10. PREPARATION FOR MOVEMENT - cont.
NOTE
Tanks manufactured by Bell-Avon have a vent pipe with a cam-lock fittng at the base (7). Step (7)
describes how to prepare these vent pipes. Tanks manufactured by Amfuel have a vent pipe with
a welded base (5.1). Step (8) describes how to prepare these vent pipes.
(7) If tank has a vent pipe with a cam-lock fitting at the base (7), prepare the vent pipe as follows:
(a) Open locking arms (6) on vent pipe coupling located in center of tank (13).
(b) Remove vent pipe (5) from vent fitting (7).
(c) Drain water from vent pipe (5) and allow to dry.
(d) Install dust cap (8) on vent fitting (7). Close locking arms on dust cap.
(8) If tank has a vent pipe with a welded base (5.1), prepare the vent pipe as follows:
(a) Remove threaded relief cap (7.1) and gasket (6.1) from vent pipe (5.1) located in center of water
tank (13).
2-14
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |