| |
3-6.
OPERATION WITH TEE ASSEMBLY. (Cont'd)
b.
Connect the other tee assembly male Q-D coupling to tank #2 gate valve female Q-D coupling.
c.
Connect service line to the tee assembly female Q-D coupling.
d.
Remove dust cap prior to connecting service line to target tank.
e.
Operate gate valves as necessary to perform tank fill or discharge operations.
Figure 3-1. Tee Assembly Operation
3-7
|