Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: PREASSEMBLY INSPECTION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

(4)   Once skid has been removed from site area, unfold tank by returning the top layers to their original position. Tank should now be in the same position as illustrated in Figure 2-6. (5)   Perform steps 1 and m. 2-3. PREASSEMBLY  INSPECTION.    To  ensure  that  the  tank  has  not  been  damaged  during  shipment,  conduct  an inspection before assembly. a. Unpack consolidation box and check that all components are present. b. Check that each female coupling has a sealing gasket.   Replace all missing gaskets.  Refer to Chapter 4 of this manual for replacement. c. Check cam arm operation for all female couplings.  Do not use couplings with broken, bent, or faulty cam arms. d. Check  that  the  gate  valves  open  and  close.    Refer  to  Chapter  4  of  this  manual  for  replacement  of gate valves. e. Check tank for punctures or tears. 2-9

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business