| |
m. Use deployment straps and tank handles to fully unfold tank. Tank should be laying smooth without folds.
Figure 2-8. Tank Fully Unfolded
NOTE
Tank should be centered within the deployment site with one drain assembly at low end
of site. Use tank handles to move tank, if necessary.
n.
Alternate Deployment Procedures.
NOTE
The following procedures are provided as an alternate method for off-loading tank from
skid.
(1) Unroll remaining section of tank by pushing roll in opposite direction; tank will be fully unrolled. (See Figure
2-9.)
2-7
|