c.
Loosen tape which secures the crate liner to the crate sides and ends.
d.
Locate and remove the remaining lag bolts from the crate sides and ends (11 lag bolts on each side and 10
lag bolts on each end). Remove crate sides and ends, and place them outside site area.
e.
Remove consolidation box from skid and place box outside site area. Only tank and slings remain on skid
(Figure 2-2).
CAUTION
Do not lift tank without the use of slings and authorized lifting equipment. Damage to tank may result.
NOTE
If authorized lifting equipment is available, lift tank using lifting slings and remove skid
from area. When lowering tank to ground, be sure to return it to its original position.
Proceed to step g. to complete tank deployment.
If authorized lifting equipment is not available, continue with step f.
f.
Fold back crate liner and lifting slings. Make sure liner, lifting straps and D-rings are laying flat. The slings
and liner will be used during re-deployment.
2-3
|