| |
TM 5-5430-210-12
Refer to figure 2-8 and make certain
that valve handle has been rotated
f u l l y
c l o c k w i s e t o
the
c l o s e d
position before proceeding. Failure
t o
c l o s e
the
valve
handle
can
c a u s e l o s s o f
f u e l a n d p o s s i b l e
fire or explosion.
Figure 2-8. Drain Control Valve, All Tanks Except 3,000 Gallon (11,355 Liter).
(4) Dig a shallow and narrow trench to the
5430-00-268-8187, NSN 5430-01-215-7525, and
outer edge and away from the tank to provide for
NSN 5430-00-182-8181).
the extension of the drain hose and control valve,
a. Remove the 4-inch (10.16-centimeter) dust
(5) Return the tank end to a flat position and
cap from the elbow (fig. 2-5) which will be used for
lay the drain hose and control valve in the trench.
filling.
Refer to figure 2-8 and make
that valve handle has been
f u l l y
c l o c k w i s e t o
the
b. The filler and discharge hose assembly is fit-
ted with quick disconnect female coupling on one
c e r t a i n
end and a quick disconnect male adapter on the
other end, (fig. 2-9) Place the female coupler on the
rotated
male adapter end of the filler and discharge elbow
closed
(fig. 2-5) and depress the coupler cam-lever arms
Failure
t o
handle
locking the hose assembly in place.
c l o s e
the
valve
can
c a u s e l oS S o f f u e l a n d p o s s i b l e
c. Attach the control valve to the hose using the
fire or explosion.
same procedure mentioned in step b. above.
d. Be sure the control valve is closed by turning
2-7. Installation of Filler and Discharge Hose and
the valve handle in a clockwise rotation until it
Control Valve Assembly.
(Tanks, NSN
stops (fig. 2-10).
2-8 Change 5
position before proceeding.
|