| |
TM 5-4930-234-13&P
(b)
Install retaining ring (15) on end of cone.
(c)
Install pusher over end of cone. Push down until retaining ring (15) snaps into groove of flow control pin
(21).
(d)
Remove pusher and cone from handle (22).
48.
Remove pin positioning block, S1391-13, from body (49).
49.
Remove rack positioning tool, S1391-10, from outlet end of body (49).
50.
If removed, install new I.D. label (48) on side of body (49) using adhesive (Item 3, Appendix E).
NOTE
For nozzle assembly, model AE83206R, use label 23052-3. For nozzle assembly,
model AE83501R, use label 23052-4.
51.
If removed, install new decal (50) on pullback sleeve (34).
52.
Check handle operation as follows.
(a)
Press thumb latch (26).
(b)
Move handle (22) from FLOW (on) to NO FLOW (off) position.
(c)
Release thumb latch (26).
NOTE
With thumb latch released handle must lock in flow or no flow positions.
(d)
Handle (22) must move without sticking or binding. If it does not, disassemble handle components and
check for proper assembly. Repeat disassembly step 16 and assembly steps 41 through 49 above.
(e)
Thumb latch (26) must engage in notches of end cap (6) and must lock handle (22) in position. If it does
not, check locking ear on thumb latch (26). If it is broken, replace thumb latch (26).
53.
Check operation of pullback sleeve (34) and latches (39) as follows.
(a)
Depress release pins (40). Pull pullback sleeve (34) towards handle (22). It must move freely without
binding. If it does not, disassemble nozzle and check parts for correct order of assembly.
( b) With pullback sleeve (34) pulled toward handle (22), all six latches (39) must pivot without binding. If
they do not, check latches (39) and adapter (43) for damage.
5-27
|