| |
TM 5-4930-234-13&P
2.
Inspect cable (3) for corrosion, cracks, or fraying.
d.
Replacement. Replace any damaged parts.
e.
Reassembly.
1.
Slide sleeve (4) down cable (3).
2.
Insert one end of cable (3) through hole in dust cap (2).
3.
Make a one inch loop with the cable (3) and slide sleeve (4) over end of cable (3).
4.
Crimp sleeve (4) in place on cable (3).
5.
If required, repeat steps 1 through 4 for other end of cable (3).
f.
Installation.
1.
Install dust cap (2) on end of unisex coupling (5) and turn clockwise.
2.
Install end of cable (3) on ring of nozzle (1).
4-12.
UNISEX COUPLING ASSE4BLY (See Figure 4-6).
a.
Removal.
1.
Turn coupling (5) counterclockwise to remove from nozzle (1).
2.
Remove o-ring (6) from coupling (5). Replace o-ring (6) if cut or distorted.
b.
Installation.
1.
Install o-ring (6) on threaded end of coupling (5).
2.
Install coupling (5) in nozzle (1) and turn clockwise until hand-tight.
Section V. PREPARATION FOR STORAGE OR SHIPMENT
4-13.
ADMINISTRATIVE STORAGE
a.
Placement of equipment in administrative storage should be for short periods of time when a shortage of
maintenance effort exists. Items should be in mission readiness within 24 hours or within the time factors as determined
by the directing authority. During the storage period appropriate maintenance records will be kept.
b.
Before placing equipment in administrative storage, current maintenance services and equipment serviceable
criteria (ESC) evaluations should be completed, shortcomings and deficiencies should be corrected, and all modification
work orders (MWOs) should be applied.
c.
Storage site selection. Inside storage is preferred for items selected for administrative storage. If inside
storage is not available, trucks, vans, conex containers and other containers may be used.
Change 2 4-13
|