Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Table 3-1. Unit Preventive Maintenance Checks and Services - Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4320-308-13 Table 3-1.  Unit Preventive Maintenance Checks and Services - Continued B - Before Operation A - After Operation M - Monthly D - During Operation W - Weekly INTERVAL ITEM TO BE INSPECTED Equipment is Item PROCEDURE Not Ready/ No. B D A W M Available If: 14 Pump Case Assembly, Volute, and Suction (Intake) Flange - Continued. Listen for unusual noise during pump operation.      Unusual noise indicates dam- age to pump case assembly and volute. Check volute (1), pump case assembly (2), and Pump case as- suction (intake) flange (3) for cracks and corrosion. sembly compo- nents are cracked Check studs (4 and 5) for damaged or corroded or damaged se- threads. verely enough to prevent safe use. Check condition of paint.  Paint shall be in good con- Inspection indi- dition with no bare metal or corrosion. cates pump may bind during operation. 3-22

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business