Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Table 3-1. Unit Preventive Maintenance Checks and Services - Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4320-308-13 Table 3-1.  Unit Preventive Maintenance Checks and Services - Continued B - Before Operation A - After Operation M - Monthly D - During Operation W - Weekly INTERVAL ITEM TO BE INSPECTED Equipment is Item PROCEDURE Not Ready/ No. B D A W M Available If: 11 Fuel System - Continued.          Check fuel hoses (1) for leaks at ring pieces (2) and Class III leakage banjo bolts (3). is present or fire hazard exists.          Check for fuel leaks at mating parts of fuel lift pump (4).         Check for fuel leaks at fuel filter (5). Check fuel hoses (1) for leaks, cracks, holes, and abrasions. Check for oil leak between fuel lift pump (4) and crankcase (6). 3-15

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business