Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: REPLACE/REPAIR PUMP ASSEMBLY (Continued)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4320-305-24 3-4. REPLACE/REPAIR PUMP ASSEMBLY (Continued) WARNING Death  or  serious  injury  could  occur  if  unauthorized  or  unnecessary personnel  are  in  the  hoisting  area.  Permit  only  personnel  actually engaged  in  the  hoisting  operation  to  be  near  the  unit  and  hoisting equipment.  All  instructions  for  the  hoisting  operations  must  come from one authorized person Injury   to   personnel   or   damage   to   equipment   could   occur   from improper  hoisting.  Hoist  the  load  slowly  to  avoid  tearing  out  lifting bail  assembly,  slipping  slings,  or  load  shift.  Do  not  jerk  the  load  or swing   it   from   side-to-side   when   hoisting.   This   places   additional stress  on  hoisting  components  which  can  cause  failure  and  loss  of load.  Be  sure  hoisting  equipment  is  on  solid  footing  and  is  suitable for  the  size  of  the  load.  Watch  boom  angle  and  overhead  clearance when hoisting. 2 Position a suitable lifting device equipped with a spreader bar and slings over pump assembly (2). Attach slings (3) around assembly and put tension on slings. Make sure pump assembly is properly supported. Spread slings on spreader bar so that slings hang vertically when attached to assembly. 3 Remove screws (4), nuts (5), lockwashers (6), flat washers (7), and shims (8). NOTE Flywheel guards are mounted to bearing housing with screws that mount bearing housing to flywheel housing. 4 Remove screws and lockwashers (9). 5 Remove flywheel guards (10). 6 Lift and remove pump assembly (2) from trailer and engine assembly, and lower onto blocks on a stable, level work platform. 3-8

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business