| |
TM 5-4320-305-10
Table 2-2. Preventive Maintenance Checks and Services - Continued
B - Before Operation
D - During Operation
A - After Operation
W - Weekly
INTERVAL
ITEM TO BE INSPECTED
ITEM
PROCEDURE
Equipment is Not
NO
B
D
A
W
Ready/Available If:
Fuel Lines and Fittings -Continued.
Fuel pump (1) has secure and undamaged cover, upper
chamber, pump body, banjo bolts (2), and banjo fittings.
Injector lines (3) are securely mounted.
Inspect the following fuel lines for leaks along the length
of each line for holes, cracks, worn spots, kinks or
looseness, and other damage that would cause deteriora-
tion during operation resulting in fuel leaks or restricted
fuel flow. Check that each line is securely mounted and
during operation would be free of vibration that would
cause wear or abrasion.
Fuel supply line (4)
Separator-to-pump line (5)
Pump-to-filter line (6)
Injector lines (3)
Backleakage (7)
Overflow line (8)
Fuel return line (9)
Change 1 2-61
|