Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Table 2-2. Preventive Maintenance Checks and Services - Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4320-305-10 Table 2-2.  Preventive Maintenance Checks and Services - Continued B - Before Operation D - During Operation A - After Operation W - Weekly INTERVAL ITEM TO BE INSPECTED ITEM PROCEDURE Equipment is Not NO B D A W Ready/Available If: 11 Lifting Ball Assembly. Lifting bail as- sembly is cracked, Check that screws (1) are not loose or corroded. broken, corroded and screws are Check for cracks in base metal and/or welds. loose or missing. Check 3-inch (76 mm) diameter hole (2) for wear and NOTE cracks. This applies Check for corrosion, especially at mating areas. only when cen trifugal pump unit is lifted. 2-24

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business