| |
TM 5-4320-305-10
Table 2-2. Preventive Maintenance Checks and Services - Continued
B - Before Operation
D - During Operation
A - After Operation
W - Weekly
INTERVAL
ITEM TO BE INSPECTED
ITEM
PROCEDURE
Equipment is Not
NO
B
D
A
W
Ready/Available If:
8
Rear Jack Assembly.
Cracks in tripod
legs or mounting
Inspect for missing hitch pin (1)
flanges.
Inspect for bends or cracks in jacks (2), extensions (3),
jack cantilever tubes (4), or locator tubes (5) on trailer
frame.
Inspect for free operation of jack cranks (6).
Check rear jack assemblies to determine if they can be
lowered, raised, and locked in place freely.
Be sure that pads (7), pad mounting bolts (8), and nuts
and Iockwashers (9) are available.
2-22
|