| |
TM 5-4320-304-14
TM 08922A-14/1
4-5. INSPECTING EQUIPMENT
a. Inspect the equipment for damage incurred during shipment. If the equipment has been damaged,
report the damage on (A) DD Form 6, Packaging Improvement Report, or (MC) MCO 4430.3.
b. Check the equipment against the packing slip to see if the shipment is complete. Report all
discrepancies in accordance with the instructions of DA PAM 738-750.
c. Check to see whether the equipment has been modified.
4-6. SETUP INSTRUCTIONS
a. Locate unit as close as possible to the water to be pumped. Keep the suction hose and the
amount of lift as short as possible.
b. The operating site should be as level as possible (no more than 20 degrees slope) or the engine
lubrication system may not work properly.
c. Keep the suction and discharge hoses as short and straight as possible.
d. Allow adequate space to permit support of the suction and discharge hoses where they enter
the pump.
e. Connect the suction hose to hose adapter on suction (intake) flange (1). Highest point in the
suction hose should be at the pump.
f.
g.
4-2
Connect discharge hose to hose adapter in discharge port (2).
Make sure that connections are tight.
|