| |
TM 5-4320-304-14
TM 08922A-14/1
Item
No.
7
2-14
Table 2-2. Operators Preventive Maintenance Checks and Services Continued
B Before Operation
A After Operation
M Monthly
D During Operation
W Weekly
B
Interval
D
l
l
l
A
w
M
l
l
l
ITEM TO BE INSPECTED
PROCEDURE
Fuel System - Continued.
Check fuel hoses (1) for leaks at ring pieces (2) and
banjo bolts (3).
Check for fuel leaks at mating parts of fuel lift
pump (4).
Check for fuel leaks at fuel filter (5).
Equipment is
Not Ready/
Available If:
Class III leakage
is present or fire
hazard exists.
|