|
|
2-2. Starting
(3) Increase operation to 1,500 (revolution
per minute) for one-half hour.
a. Preparation for Starting.
(4) Increase operation to 2,000 (revolutions
(1) Perform the daily preventive maintenance
per minute) for one-half hour.
service (para 3-4).
c. Starting. Refer to figure 2-2 and start the
(2) Refer to TM 5-2805-259-14 for engine
pumping assembly.
pre-starting instructions.
CAUTION
b. Initial Operation. Prior to placing a new pump
Inspect to see that the unit has been
assembly into continuous and full-load operation,
properly grounded prior to starting.
perform the following prescribed procedure:
CAUTION
(1) Start the pump assembly as prescribed in
Never operate the pump assembly
c below.
without priming charge in the pump
(2) Operate the pump assembly for one hour
casing or serious damage will result.
at 1,000 rpm (revolutions per minutes).
2-5
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |