Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: DRY CHEMICAL SHUTOFF VALVE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 07661B-14/1 APPENDIX A covering.  Secure with white plastic tape. (5) Pressurize system and check for leaks, paragraph 3-13. (6) Return system to standby status, paragraph 2-12a. A 3-20.  DRY CHEMICAL SHUTOFF VALVE. a. Removal. (1) Depressurize dry chemical system completely, paragraph 3-12. (2) Disconnect valve rod (1, figure 3-11) from dry chemical valve by removing nut (2). (3) Uncouple discharge hose (4) at nipple (5).  Disconnect hose (6) from swivel adapter (7). (4) Remove shutoff valve (3) along with short pipe (8) and side outlet elbow (9) from tank discharge port.  A small amount of chemical will drain from pickup tube inside tank when valve is removed.  If chemical continues to flow, release any residual pressure in tank by loosening fill cap. (5) Remove swivel adapter (7), nipple (8) and elbow (9) as an assembly from shutoff valve. b. Installation. (1) Before  assembling  or  installing  pipe  fittings,  seal  threads  using  instructions  in  NOTE,  paragraph  3-14c. Assemble valve assembly (3) on pipe (10), as shown in figure 3-11.  Install nipple (8) and elbow (9) and swivel adapter (7) into valve (3). (2) Connect hose (6) to swivel adapter (7) in side outlet elbow.  Recouple discharge hose (4) to nipple (5). (3) Connect valve rod (1) to shutoff valve by installing nut (2) to shut-off valve (3). (4) Tighten fill cap, pressurize system and check for leaks, paragraph 3-14. (5) Return dry chemical system to standby status, paragraph 2-12a. A 3-21.  PRESSURE RELIEF VALVES. a. Removal. (1) Depressurize system completely, paragraph 3-12. (2) Using a wrench on the hex of the relief valve, unscrew valve from piping. b. Installation. (1) Before  assembling  or  installing  pipe  fittings,  seal  threads  using  instructions  in  NOTE,  paragraph  3-14c. Assemble relief valve on piping.  Tighten securely. (2) Pressurize system and check for leaks, paragraph 3-13. A 3-22.  FUSIBLE PLUG. a. Removal. (1) Access to plug is through bottom of skid frame.  (Figure 1-8). (2) Depressurize AFFF tank completely.  Plug removal will result in tank draining.  Be prepared to collect any AFFF solution remaining in tank. (3) Using a wrench on hex of plug, turn plug counterclockwise to remove. A 3-28

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business