Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Testing Kit One (1) per TPT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

3-33   Equipment and Line Identification Marking - Cont'd . 3-33.2 It  is  also  recommended  that  consideration  be  given  to  marking  hoselines  and  pipelines  with  color-coded bands and direction of flow arrows as described in MIL STD 161 F. Care must be taken to correct the marking if the service of a marked section of hose is changed. 3-34   Testing Kit One (1) per TPT Check out and store in location designated by operating management. 3-35   Area Clean-up The area must be cleaned up by the installation crew prior to commencing operations. Remove  all  construction  dregs,  obstructions,  boxes,  etc.    Unused  materials,  hose,  fittings,  etc.,  should  be  stored  in  a specific  area  for  future  use.    All  caps,  plugs,  etc.,  should  be  boxed  and  marked  for  use  in  the  event  the  system  is disassembled for shipment. 3-36   Final Inspection     3-36.1 It  is  important  to  make  a  final  inspection  utilizing  a  check-off  list  arranged  essentially  in  the  order  of  this installation  procedure.   This  should  be  done  by  supervisory  and  management  personnel  from  both  the  installation  and operating groups. 3-36.2 The points of inspection to be emphasized include but are not limited to: a. Integrity and height of tank berms closed berm drain. b. Floodlights Location and operability.  Grounding. c. Proper laydown of fabric collapsible tanks proper connection of appurtenances. d. Pumps Serviced, location, operability.  Grounded. e. Meter-strainers Flow direction.  Grounding. f. Filter-separators Flow direction, test adapter installed, grounded. g. Hoselines,  Valves,  Fittings.    All  couplings  closed,  flanges  tight,  valve  packing  glands  tight,  valves  in  operable position  and  closed.    No  sharp  bends,  proper  lay  on  tank  tops,  sandbags  on  ends  and  bend  subject  to  whip  adequate walkways over hose, evidence of damage. h. Sampling assembly Operable location and joints tight.  Valves closed.  Grounded. i. Fire suppression equipment Proof of check out, location, marking. j. Safety and no smoking signs Readable and in place. k. Review pressure test results and proof of corrective action. 3-28

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business