TM 10-6630-247-13&P
Section III. OPERATOR MAINTENANCE PROCEDURES
3-4. COMPONENT REPLACEMENT.
WARNINGS
l To prevent electrical shock to personnel and damage to the equipment,
disconnect electrical heaters and slow speed stirrer from electrical power
source before removal.
l To prevent severe burns to personnel, allow electrical heaters to cool
before attempting removal.
Operator replacement of test kit components is performed by removing the defective component (flask, jar,
brush, straps, etc. ) from the test kit and installing a serviceable replacement. The distillation unit and flash
point tester must be returned to unit maintenance for repairs.
3-4
|