Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section III. OPERATION UNDER USUAL CONDITIONS
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-6630-247-13&P Section III. OPERATION UNDER USUAL CONDITIONS 2-7. ASSEMBLY AND PREPARATION FOR USE. a. Site  Selection.  Site  selection  must  consider  availability  of  electrical  power  and  access  to  fuel storage  facilities.  The  test  kit  should  be  setup  in  a  tent  or  shelter  to  protect  test  equipment  and fuel samples from wind, dust, rain, or snow. The site should be as level and dry as possible. b. Setup  Cabinet  Assembly.  Refer  to  figure  2-5. (1) Pull  out  carrying  handles  (1)  from  both  sides  of  cabinet  (2). (2) Remove  detent  pins  (3)  securing  legs  (4)  to  cabinet  (2). WARNING The  test  kit  is  heavy  and  can  be  difficult  to  handle.  Four  personnel  are required  to  lift  and  transport  the  test  kit  to  prevent  injury  to  personnel and  damage  to  the  equipment.  A  fifth  person  is  required  to  lower  the  legs of the cabinet while cabinet is held up off ground. (3) Using  four  personnel,  lift  cabinet  (2)  off  ground. WARNING To  prevent  injury  to  personnel  and  damage  to  the  equipment,  leg  braces must  be  locked  in  the  down  position  before  releasing  weight  of  cabinet onto  legs.  Cabinet  may  fall  if  braces  are  not  securely  locked. (4) Pull  legs  (4)  down  from  cabinet  (2)  until  fully  extended.  Make  sure  braces  (5)  are  straight and  securely  locked. (5) Unlock  barrel  bolts  (6)  and  adjust  leveling  legs  (7)  up  or  down  as  required  to  level  cabinet. Lock  barrel  bolts  into  leveling  legs  when  adjustment  is  complete.  Lower  cabinet  (2)  to ground. (6) Unlock  right  door  handle  (8).  Fully  open  left  and  right  doors  (9  and  10). (7) Unfasten  table  top  latch  (11). (8) Unfold left table top (12) down onto left door (10). (9) Unfold right table top (13) down onto right door (9). 2-13

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business