Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: PREPARATION FOR STORAGE OR SHIPMENT CONT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-5430-242-12&P 0034 00 0034 00-2 11. For Reliance Model tanks, apply technical talc (Item 11, WP 0042 00) to the tank interior. 12. Install the filler/discharge assembly on the tank (WP 0027 00 or WP 0028 00). 13. Install the dust caps on the flanged adapters of the filler/discharge assemblies. 14. Brush off all debris clinging to the fabric material of the tank. 15. For Reliance Model tanks, apply technical talc (Item 11, WP 0042 00) to the tank exterior. 16. Fold the tank from the sides towards the middle. 17. Roll the tank from the end opposite the drain fitting. 18. Plug the exposed hose assembly openings with suitable, clean materials. CRATING INSTRUCTIONS 1.    Make sure the tank has been properly folded (WP 0005 00). CAUTION Use care when packing the tank.  The tank will be easily damaged by tools, packing box nails, or other sharp objects. 2.    Pack the tank in a close-fitting box or container.  When the tank is disassembled and refolded, it is to be replaced in the original box or container. 3.    Each tank is provided with suitable packing around the tank to prevent the tank fabric from being damaged by contact with the inside of the box or container.  When the tank is replaced in the original box or container, the packing material is replaced around the tank in the same manner as received. ADMINISTRATIVE STORAGE 1.   Placement of equipment in administrative storage should be for short periods of time when a shortage of maintenance effort exists.  Items should be in mission readiness within 24 hours or within the time factors determined by the directing authority.  During the storage period, appropriate maintenance records will be kept. 2.   Before placing the equipment in administrative storage, current preventive maintenance checks and services should be completed, shortcomings and deficiencies should be corrected, and all Modification Work Orders (MWO) should be applied. 3.   Inside storage is preferred for items selected for administrative storage.  If inside storage is not available, trucks, vans, conex containers, and other containers may be used.  Refer to WP 0002 00 for ambient storage temperature range. END OF WORK PACKAGE

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business