|
|
TM 10-5430-239-12&P
0023 00
ASSEMBLY
1. Install screw (16) and one end of chain assembly (6) on plug (17).
2. Lubricate new o-ring (9) with silicone compound. Position o-ring (9) in groove on tank fitting (8).
3. Align drain fitting (7) on tank fitting (8). Place other end of chain assembly (6) and one washer (5) on
one screw (4). Install and torque eight screws (4) and washers (5) to 15 ft-lbs (20.34 Nm) using eight
bolt tightening pattern.
4. Apply sealing compound or anti-seize tape to threads of hose assembly (3). Engage threads of hose
assembly (3) and drain fitting (7). Turn hose assembly (3) clockwise until tight. Make sure hose
assembly (3) and gate valve (2) will extend from under tank.
5. Position new gasket (10) in hose quick-disconnect coupling half (11). Insert coupling half (11) on
valve coupler (18). Push both cam-lever arms (1) in at the same time to lock hose assembly (3) on
valve coupler (18).
6. Position new gasket (15) in dust cap (13) and insert dust cap (13) on coupler (14). Push in both cam-
lever arms (12) at the same time to lock dust cap (13) on coupler (14).
END OF WORK PACKAGE
0023 00-3/4 blank
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |