Click here to make tpub.com your Home Page

Page Title: SERVICE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-5430-239-12&P
0019 00
SERVICE
WARNING
Dry cleaning solvent A-A-59601, used to clean parts, is potentially dangerous
to personnel and property. It produces toxic and flammable fumes.
Use only in well-ventilated areas. Avoid repeated and prolonged skin contact.
Do not use near an open flame or excessive heat. The flash point of solvent
is 100F to 138F (38C to 59C).
1. Clean all parts with dry cleaning solvent and dry thoroughly.
2. Clean out o-ring grooves with dry cleaning solvent and dry thoroughly with rags.
3. Inspect all mechanical parts for cracks, dents, breaks or wear. Replace or repair if unserviceable.
4. Ensure that vent hole in flame arrestor (14) is clear.
ASSEMBLY
1. Place new gasket (13) inside relief cap (12).
2. Install flame arrestor (14) on relief cap (12) by turning flame arrestor clockwise until the two pieces
are joined tightly together.
3. Install flame arrestor (14) and relief cap (12) on vent stand pipe (11) until vent stand pipe contacts
relief cap (12).
4. Rotate relief cap (12) clockwise until vent stand pipe (11) and relief cap (12) are joined together
tightly.
5. Insert vent stand pipe (11) in quick-disconnect coupling (8) and rotate pipe clockwise until the two
pieces are joined tightly together.
6. Insert new gasket (10) into female quick-disconnect coupling (8).
7. With cam-lever arms (9) in outward position, install female quick-disconnect coupling (8) on male-
flanged adapter (4). Push cam-lever arms (9) in until locked in place.
8. Install new gasket (15) in dust cap (16).
INSTALLATION
1. Lubricate new o-ring (6) with silicone compound. Install o-ring (6) in packing groove (7) in tank fitting
(5).
2. Install eight screws (1) and washers (2) through vent and stand pipe assembly (3) and tank fitting (5).
Torque screws (1) to 30 in-lb (3.41 Nm) in accordance with 8 bolt torque pattern. For GTA model,
torque screws (1) to 10 ft-lb (13.5 Nm).
END OF WORK PACKAGE
0019 00-3/4 blank

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business