|
|
TM 10-5430-239-12&P
0005 00
NOTE
The following procedure is provided as an alternative method for off-loading tank
from skid.
9. Alternate Deployment Procedure:
a. Unroll remaining section of tank (2) by pushing roll in opposite direction. Tank (2) will be
fully unrolled.
2
6
1
b. Using tank handles (6), located on the S-folded end, fold tank (2) back length-wise until
skid (1) is exposed (free).
c.
Remove skid (1) from deployment site.
1
6
2
d. Once skid (1) has been removed from site area, unfold tank (2) by returning the top
layers to their original position. Go back and perform steps 6 through 8.
0005 00-8
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |