Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-5430-238-12&P
0024 00
5. Position bonnet (9) over valve stem (2) and install four cap screws (8). Torque cap screws (8) to
16 ft-lbs (21.04 Nm).
6. Install new valve stem seal (7), gland ring (6), travel stop (5), and valve stem nut (4) onto valve
stem (2).
7. Position handle (3) on valve stem (2). Install and tighten handle-nut (1) on valve stem (2).
INSTALLATION
Coat the threads of the drain hose assembly with thread sealing compound or anti-seize tape, and install
the drain ball valve on the drain hose assembly.
END OF WORK PACKAGE
0024 00-3/4 blank

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business