Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-5430-238-12&P
0021 00
INSTALLATION
1. Align male coupling (13) and new flange gasket (14) on ball valve (11).
2. Install eight nuts (7), new lockwashers (8), washers (9), and screws (10) to male coupling (13) and
ball valve (11). Torque the fastening hardware to 30 in-lbs (3.41Nm).
3. Align female coupling (6) and new flange gasket (12) on ball valve (11).
4. Install eight nuts (7), new lockwashers (8), washers (9), and screws (10) to female coupling (6)
and ball valve (11). Torque the fastening hardware to 30 in-lbs (3.41 Nm).
5. Install new gaskets (5) in female coupling (6) and dust cap (3).
6. Connect chains (1) to key rings (2) and install dust cap (3) and dust plug (4) to female coupling (6)
and male coupling (13).
END OF WORK PACKAGE
0021 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business