|
|
TM 10-5430-238-12&P
0019 00
INSTALLATION
Hose Assembly, Coupling, and Adapter
1. Position new flange gasket (20) on the face of gate valve (15), and align the holes.
2. Position male-flanged adapter (7) against flange gasket (20), and align the holes.
3. Install washers (19) and hex-head cap screws (18) onto male-flanged adapter (7), flange gasket (20),
and gate valve (15).
4. Install new lockwashers (17), and hex nuts (16) onto gate valve (15). Torque nuts (16) to 30 in-lb
(3.41Nm).
5. At the opposite end of gate valve (15), position new flange gasket (14) against gate valve (15).
6. Position female quick-disconnect coupling (4) against flange gasket (14) and align the holes.
7. Install washers (13) and hex-head cap screws (12) onto female quick-disconnect coupling (4), flange
gasket (14), and the face of gate valve (15).
8. Install new lockwashers (11) and hex nuts (10) onto hex-head cap screws (12). Torque nuts (10) to 30
in-lb (3.41Nm).
9. Lubricate new coupling gasket (9), and install coupling gasket (9) on the inside of female quick-
disconnect coupling (4).
10. Install new gasket (8) on male-flanged adapter (7). Install chains and dust cap (5) and dust plug (6)
on coupling (4) and adapter (7).
11. Install hose assembly (1) to gate valve assembly (2) and position hose assembly (1) in place by
pushing in on cam-lever arms (3).
END OF WORK PACKAGE
0019 00-6
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |