| |
TM 10-5430-237-12&P
0020 00
0020 00-1
UNIT MAINTENANCE
HANDLE TOGGLE (Models 90074/91038)
REMOVAL AND INSTALLATION
REPAIR
INITIAL SETUP
Tools
Tool Kit, General Mechanics
(Item 3, Table 2, WP 0026 00)
Hacksaw
Drill, 1/2"
Drill bit, 1/2"
(Item 4, Table 2, WP 0026 00)
REMOVAL
Handle
1. Untie knot (4).
2. Remove handle (1) from rope (2).
Rope
Pull rope (2) out of base patch (3) on tank, if it is being replaced.
REPAIR
Refer to WP 0031 00, Items 1 and 2 for repair.
CAUTION
Use caution when feeding rope through base patch. Ensure instrument is blunt;
otherwise, damage may occur.
INSTALLATION
Rope
Install new rope (2) through holes in base patch (3) on tank by feeding the rope through base patch.
|