Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: UNIT MAINTENANCE PROCEDURES
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-5430-237-12&P 0017 00 0017 00-1/2 blank OPERATOR AND UNIT MAINTENANCE   COLLAPSIBLE FABRIC TANK, WATER STORAGE, 3000 GALLONS UNIT MAINTENANCE PROCEDURES   GENERAL INSTRUCTIONS Maintenance instructions in this section will list resources required, personnel required and equipment conditions for start of procedure, except as noted below: = Personnel required are listed only if the task requires more than one. = The normal standard equipment condition to start a maintenance task is water tank drained and deflated.  EQUIPMENT CONDITION is not listed unless some other condition is required. EQUIPMENT MAINTENANCE PROCEDURE    Tank Assembly WP 0018 00    Inflation Valve Assembly (Models 90074/91038) WP 0019 00    Handle-Toggle (Models 90074/91038)   WP 0020 00    Fill/Discharge Fitting, Female Cam-Lock Coupling WP 0021 00    Fill/Discharge Fitting, Male Cam-Lock Coupling WP 0022 00    Ball Valve, Male and Female Cam-Lock Coupling (Models WP 0023 00       3-K-W-O-A/Z/GTA-Z60TPW) END OF WORK PACKAGE

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business