Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: SITE AND SHELTER REQUIREMENTS
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

                                                           TM 10-5430-237-12&P                                             0015 00 0015 00-1/2 blank   OPERATOR AND UNIT MAINTENANCE INSTRUCTION COLLAPSIBLE FABRIC TANK, WATER STORAGE, 3000 GALLONS UNIT SERVICE UPON RECEIPT SITE AND SHELTER REQUIREMENTS. Choose a site that is free from sharp objects (rocks, sticks, glass, etc.) which could cut or puncture the tank.                                                                                   WARNING Serious injury to personnel, or damage to tank may occur if tank is placed over   drop offs greater than 4 inches (0.1 meter). The collapsible fabric water tank may be installed on a slope of up to 10 percent [1 foot (0.3 meter) rise in 10 foot (3 meters) run], but the tank base should not rest over abrupt drop offs greater than 4 inches (0.1 meter). SERVICE UPON RECEIPT OF MATERIEL. Inspect the equipment for damage incurred during shipment.  If the equipment has been damaged, report the damage in accordance with the instructions of DA PAM 738-750.  Marine Corps users refer to MCO P4610.19 and use DD Form 364. Check the equipment against the packing slip to see if the shipment is complete.  Report all discrepancies in accordance with the instructions of DA PAM 738-750.  Marine Corps users refer to MCO 44303. Check to see whether the equipment has been modified. INSTALLATION INSTRUCTIONS. Refer to WP 0005 00. PRELIMINARY SERVICING AND ADJUSTMENT OF EQUIPMENT. No preliminary servicing or adjustment is required. END OF WORK PACKAGE

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business