Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INTERIM NUCLEAR, BIOLOGICAL, AND CHEMICAL (NBC) DECONTAMINATION PROCEDURES.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

                                                                  TM 10-5430-237-12&P                                                    0006 00 0006 00-4 NOTE It may be necessary to increase the size of the tears in order to be able to insert the bottom plate of the clamp. 4.  Loop cord around wrist (1) to prevent loss of clamp into tank. 5.  Slip the bottom plate of the clamp (2) through the hole or tear and rotate it until it is centered and its length runs with the tear. 6.  Pull bottom plate up against fabric, and slide top plate and wing nut (3) down cord and onto threaded stud (4) of bottom plate. CAUTION Do not over tighten, as stud threads may be stripped, or damage to tank fabric may occur. 7.  With plates aligned, tighten wing nut (5) to clamp the tank wall between the two plates.  Tighten enough to stop leak.   INTERIM NUCLEAR, BIOLOGICAL, AND CHEMICAL (NBC) DECONTAMINATION PROCEDURES. NOTE Detailed decontamination procedures can be found in: FM 3-3, FM 3-4,   and FM 3-5. General.   The following emergency procedures can be performed until field NBC decontamination facilities are available.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business