Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: UNIT MAINTENANCE PREPARATION FOR STORAGE OR SHIPMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

                                                              TM 10-5430-237-12&P                                                        0024 00 0024 00-1/2 blank UNIT MAINTENANCE PREPARATION FOR STORAGE OR SHIPMENT   PRESERVATION PROCEDURES FOR STORAGE OR SHIPMENT 1.  Drain all water from the tank (WP 0005 00).                                                                      CAUTION Make sure tank is completely dry before storing.  Water will create mildew, decreasing the life of the tank if it is not completely dry. 2.  Clean and dry the tank (WP 0005 00). 3.  Models 90074, 91038 and WT2008, make sure all inflation valves (WP 0004 00) are open. CRATING INSTRUCTIONS 1.  Make sure tank has been properly folded (WP 0005 00). CAUTION Use care when packing the tank.  Tank will be easily damaged by tools, packing box nails, or other sharp objects. 2.  Tank will be packed in a close-fitting box or container.  When tank is disassembled and refolded, it is to be replaced in the original box or container. 3.  Each tank is provided with suitable packing around the tank to prevent the tank fabric from being damaged by contact with the inside of the box or container.  When tank is replaced in original box or container, the packing material is replaced around the tank in the same manner as received. ADMINISTRATIVE STORAGE 1.  Placement of equipment in administrative storage should be for short periods of time when a shortage of maintenance effort exists.  Items should be in mission readiness within 24 hours or within the time factors as determined by the directing authority.  During the storage period, appropriate maintenance records will be kept. 2.  Before placing the equipment in administrative storage, current preventive maintenance checks and services should be completed, shortcomings and deficiencies should be corrected, and all Modification Work Orders (MWO) should be applied. 3.  Inside storage is preferred for items selected for administrative storage.  If inside storage is not available, trucks, vans, conex containers, and other containers may be used.  Refer to WP 0002 00 for ambient storage temperature range. END OF WORK PACKAGE

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business