Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: UNIT MAINTENANCE VENT FITTING ASSEMBLY REPLACEMENT AND REPAIR CONT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-5430-236-12&P 0019 00 0019 00-3/4 blank CLEANING 1.  Clean all components with clean water and detergent. 2.  Rinse components in clean water and dry with wiping rag. INSPECTION 1.  Inspect coupling half (2) for cracks, corrosion and stripped threads. 2.  Inspect pipe (6) for cracks, stripped threads and corrosion. 3.  Inspect strainer element (7) for bent or damaged pivot pin. Check for freedom of movement. 4.  Inspect flame arrestor (8) for breaks or clogging.  Unclog flame arrestor (8), if required.  Replace if broken. 5.  Inspect tank compression fitting (17) for stripped threads. 6.  Inspect chain assembly (14) for damaged or broken connector and links. REPAIR Replace damaged components. ASSEMBLY 1.  Install new gasket (15) in dust cap (12). 2.  Connect chain assembly (14) to dust cap (12) with key holder (13). 3.  Lubricate new packing (16) with silicone compound before assembly.  Position packing (16) and flanged coupling (4) on compression fitting (17). 4.  Position terminal end of chain assembly (14) on flange coupling half (4) and secure flange coupling half (4) on compression fitting (17) with eight screws (10) and washers (11).  Torque screws (10) to 96 in-lbs (10.84Nm).  Refer to WP 0036 00 for torquing sequence. 5.  Position new packing (9) in strainer element (7).  Screw flame arrestor (8) into strainer element (7).   Screw strainer (7) on pipe (6) hand tight. 6.  Screw coupling half (2) on pipe (6). 7.  Install new gasket (5) in coupling half (2). INSTALLATION 1.  Position vent assembly (3) on flanged coupling half (4). 2.  While pushing vent assembly (3) on flanged coupling half (4), close locking arms (1).  Make sure coupling half (4) is securely locked. END OF WORK PACKAGE

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business