| |
TM 10-5430-236-12&P
0007 00
0007 00-4
Installing Berm Liner - Continued
WARNINGS
Berm liner weights are 225, 425 and 550 pounds (102, 193 and 250kg) respectively
for the 3,000, 10,000 and 20,000 gallon (11,355, 37,850 and 75,700L) sizes. Ensure
that sufficient personnel are available for handling.
Lifting or moving heavy equipment incorrectly can cause serious injury. Do not try
to lift or move more than 50 pounds (22.7kg) by yourself. Always use assistants
during lifting operations. Bend legs while lifting. Do not support heavy weight with
your back.
Connect Drain Hoses
1. Fold back berm liner (1) to expose the two bottom drain fittings (2).
2. Remove dust caps (3) from the two berm liner drain coupling halves. (4).
3. Remove dust plugs (5) from female couplings (6) of the two 20-foot (6.1m) drain hose assemblies (7).
Connect the hoses to the berm liner drain coupling halves (4).
|