| |
TM 10-5430-236-12&P
0006 00
0006 00-7/8 blank
Table 1. Preventative Maintenance Checks and Services
ITEM
NO.
INTERVAL
MAN-
HOUR
ITEM TO BE CHECKED
OR SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
21
After
Discharge Assembly (9)
Inspect elbow coupling
half for leaks.
Elbow coupling
half leaking.
Coupling half,
locking arms, or
gasket damaged.
22
After
Vent Fitting Assembly
(7)
a. Inspect vent fitting
coupling half for cracks
and damaged locking
arms.
b. Inspect for damaged or
missing coupling half
gasket.
c. Lift relief cap and
check for free
movement. Inspect for
cracks, bends, and
bent or broken pivot
pin.
d. Inspect pipe for cracks
or damage.
e. Inspect for loose or
missing bolts on
fittings.
Coupling half
cracked. Locking
arms damaged.
Coupling half
gasket damaged
or missing.
Relief cap binds
or is damaged.
Pipe is cracked
or damaged.
Bolts loose or
missing.
23
After
Berm Liner (2)
a. Inspect berm liner
fabric for tears,
punctures, and loose
seams.
b. Inspect for loose or
missing screws on
fittings. Tighten loose
screws.
Tear, puncture,
or loose seam
found.
Screws damaged
or missing.
24
After
Berm Liner Hose
Assembly (4)
a. Inspect hoses for
punctures or tears.
b. Inspect locking arms
and coupling halves
for damage.
c. Inspect for damaged or
missing dust caps or
plugs. Inspect caps
for damaged or
missing gaskets.
Puncture or leak
found.
Locking arms or
coupling halves
missing or
damaged.
Gaskets missing
or damaged.
END OF WORK PACKAGE
|