| |
TM 10-5430-1232-12&P
5 Install packing nut (4), handwheel (2), and jam nut (1) on to valve stem (3).
INSTALLATION (See figure 4-12.)
1 Place flange gasket (12) on face of gate valve (4) and align holes.
2 Place male flanged adapter ( 11) against flange gasket (I 2) and align holes.
3 Install washers (9) and bolts (10) on male flanged adapter (11), flange gaskets (12), and gate valve
(4).
4 Install lockwashers (8) and plain hex nut (7): torque to 30 foot-lb (40.95 N m).
5 Repeat steps 1 through 4 to install female quick disconnect coupling (6). Install dust cap (2),
dust plug (3), chains (5), and key rings (1).
4-16 Tee Assembly
This task covers: Repair
INITIAL SETUP
Materials/Parts
Cleaning solvent, item 1, appendix F
Tools
Crocus cloth, item 3. appendix F
Tool Kit General Mechanic's, Appendix B, Section III, Item 1
Grease, item 4, appendix F
Torque wrench (ft - lb), Appendix B, Section III, Item 2
Figure 4-14. Tee Assembly
DISASSEMBLY (See figure 4-14.)
1 Remove bolts (1), lockwashers (2), flatwashers (3) and nuts (4).
2 Separate female coupling (5) and male adapters (6) from tee assembly (7).
SERVICE
1 Replace flange gaskets (8) between tee (7) and both the female coupling (5) and the male adapter
(6).
2 Replace gaskets (9) in female coupling (5) and dust caps (10).
ASSEMBLY (See figure 4-14.)
1 Reattach female coupling (5) and male adapters (6), using bolts (1), lockwashers (2), flatwashers (3)
and nuts (4); torque to 30 ft lb. (40.95 Nm).
Change 1 4-27
|